31.01.2022 • Product

Two-part cable entry strip

Handling is easy: after the frame has been equipped, the end cover is put on and the two clamping levers are locked with the lower part by pressing them down. A two-stage clamping lever is used here. In a first step, the components are brought together and the grommets are positioned neatly. The second stage ensures optimal pressing pressure with subsequent secure locking. This eliminates the need to screw the cover to the frame. The torsion-proof design of the KEL-FA enables intuitive and always correct assembly. Retrofits and service work can always be carried out quickly and easily. The guarantee receipt of assembled cables used remains unaffected. The installation height of the cable entry system is a mere 22 mm.

Another advantage is the seal integrated on the back, which ensures a clean seal between the KEL-FA cable entry strip and the housing.

PhotonicsViews

New issue of PhotonicsViews available now!

New issue of PhotonicsViews available now!

The new issue of the PhotonicsViews is available. Read the latest issue for free as PDF or E-Paper.

Event

AKL – International Laser Technology Congress in Aachen

AKL – International Laser Technology Congress in Aachen

From April 22 to 24, 2026, the Fraunhofer Institute for Laser Technology ILT invites you to AKL'26. The photonics congress with over 500 participants is taking place for the 15th time, this year with a significantly expanded program, over 80 presentations, and 54 exhibitor booths.

most read